When a draft standard reaches a mature enough stage in the development process, the draft is posted for public review and comment before final publication. During the public review phase, feedback is welcomed from anyone who has a material interest in the draft.

Public Review and Comment is currently not open at this time. Watch this space for announcements.

Questions? Contact [email protected].


Per ANSI Essential Requirements

Prompt consideration shall be given to the written views and objections of all participants, including those commenting on the PINS announcement or public comment listing in Standards Action. In connection with an objection articulated during a public comment period, or submitted with a vote, an effort to resolve all expressed objections accompanied by comments related to the proposal under consideration shall be made, and each such objector shall be advised in writing (including electronic communications) of the disposition of the objection and the reasons therefor. If resolution is not achieved, each such objector shall be informed in writing that an appeals process exists within procedures used by the standards developer. In conformance with these requirements, you have the right to express an objection to the comment resolution proposed by the task group for a period of two weeks from the date of notification.

These procedures are outlined in detail in the procedures manuals found in the Public Groups documents folder.

PRÓXIMOS EVENTOS
novembro
27
Estratégias de investimento e gestão de AV na educação: Orçamentos e Expectativas

dezembro
04
CTS-D Prep 2024 (Español & Português)